Unemployed Florida


Join the forum, it's quick and easy

Unemployed Florida
Unemployed Florida
Would you like to react to this message? Create an account in a few clicks or log in to continue.

Up to 9000 Jobs to be lost at the Cape after the Shuttle goes Obsolete

4 posters

Page 3 of 6 Previous  1, 2, 3, 4, 5, 6  Next

Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty Privatization in space wise, to a point

Post  sc4ram Wed May 19, 2010 11:20 am

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty The death of NASA

Post  sc4ram Thu May 20, 2010 10:56 am

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty On The Early Retirement Of The Space Shuttle

Post  sc4ram Tue May 25, 2010 3:38 pm

On The Early Retirement Of The Space Shuttle

Decommissioning the Space Shuttle should be postponed indefinitely.
by George W. Jeffs
LaunchspaceOp Ed piece
Bethesda MD (SPX) May 25, 2010
A Symbol: An in-space ballerina and hypersonic flying marvel, the Space Shuttle Orbiter is almost impossible for others to duplicate and continues to generate international admiration and respect for U.S. technical capabilities.
Full Potential Not Yet Realized: The multi-functional Orbiter has performed "as designed" on all assignments including reentry and a key role in the International Space Station (ISS) assembly. Like any new manned system, as crews and engineers become more familiar (like a helicopter) performance "in the box" improves and extending-the-box opportunities are identified. So far the Orbiter has operated generally within the box.

Too Young For Retirement: Each remaining Orbiter has many missions and years of life remaining. The Orbiter was designed for a one hundred mission life with a factor of four (i.e. 400 flight potential). It has experienced low flight rates and has not been structurally overloaded (maximum loads occur during the boost phase and high wind shear situations have been avoided through pre-flight meteorological observations) and receives a complete examination and any necessary refurbishment between each flight.

The System is Safe for Continued Man Flights: No critical failures have originated from within the triply redundant Orbiter itself but like any spacecraft designed for light-weight, it is vulnerable to abuse (e.g. SRB O rings, ET insulation debris); these are now known and addressable problems. The Space Shuttle Main Engines (SSME)s were my principal safety concern through the development years but their flight record has been excellent and it may be that the integrity of recovered, refurbished rocket engines is as good as or even better than new ones. Some rocket engine incipient failures may lie undetected in ocean graves.

Real Usability Through "Landing With Dignity": Turnaround man hours are costly for the Orbiter, not the least demanding being the heat shield preparation and changes are continually being made to improve the situation. Even so, this relatively light-weight, first generation radiant heat shield is itself reusable and obviates having to pay for a new vehicle and other ancillary costs such as ocean recovery for every flight. Note: In depth reviews of "flown" Apollo command modules concluded that second flights of the hardware would be too costly at that time.

New Space Initiatives Depend On The Orbiter For Identification and Pursuit: The on-orbit assembly option for a deep space manned system became more viable upon completion of the International Space Station (ISS) using the Orbiter. An "Orbiter" segment of a deep space system would be used in assembly activities, on-orbit transfers, tug functions and most importantly for the crew Earth-to-orbit and orbit-to-Earth transfer. Reliance on an Orbiter for re-entry would eliminate configuration constraints on size and shape and the weight of items such as parachutes, heat shields and landing impact structure and the energy needed to transport this otherwise useless added weight throughout the entire deep space mission. This approach essentially would trade-off these advantages against the development of an additional propulsion module for return from deep space to high/low Earth orbit. The present Orbiter would be a key mechanism in the early development of such an on-orbit assembled system.

The Shuttle Continues to Be An Intriguing Candidate For "Commercialization": The system is presently operational. Its payload-to-orbit delivery and other capabilities are well documented. Its risks are known and assessable for payload insurance and crew-safety considerations and industrial elements are already doing much of the work in many areas. Bailing, leasing and/or other type of agreement for use of government equipment (Orbiters, pads, control centers, etc.) is probably feasible in some arrangement. Needed is an industry, NASA-government, Congressional meeting of the minds on all related elements including government flight requirements, (e.g. ISS servicing) and commercial pricing policies. If such a government hand-off to industry could be affected it would, of course, keep the Shuttle Program available for another decade or two should presently unforeseen government needs arise (even today it would be most helpful to have Apollo supply and rescue vehicles that serviced Skylab available for use on the ISS).

U. S. Taxpayers Have Not Yet Realized Their Full Return-on-Investment (ROI) From the Shuttle System:

+ It really works; it is not just a briefing chart promise.

+ It has much life remaining and could be the key to the identification and development of new systems.

+ It is man-rated and safe--probably as safe as any manned system will be-no others will get over one hundred flights down the learning curve.

+ The infrastructure is in place and operational and has provided industry through extensive, hands-on participation with the depth of training necessary to assume total system accountability.

+ To replace the Orbiter capabilities will take decades and billions.

Decommissioning the Space Shuttle should be postponed indefinitely.
sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty Cutting Constellation Jeopardizes National Security

Post  sc4ram Thu May 27, 2010 1:06 pm

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty Work starts on jobs plan

Post  sc4ram Sat May 29, 2010 12:39 am

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty .Lawmakers Questioning NASA Manager’s Removal

Post  sc4ram Sun May 30, 2010 10:43 am

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty Space shuttle Atlantis: Will she fly again?

Post  sc4ram Mon May 31, 2010 11:40 am

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty Re: Up to 9000 Jobs to be lost at the Cape after the Shuttle goes Obsolete

Post  Jeff Mon May 31, 2010 11:15 pm

Good luck to the 9000 laid off NASA people in finding a job in this economy. Does McDonalds hire rocket scientists?

Jeff

Posts : 159
Join date : 2009-09-14
Location : Clermont, Fl.

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty Approaching Space Center, and End of Line for Shuttle Program

Post  sc4ram Wed Jun 02, 2010 12:54 am

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty End of an era in space travel is sneaking up on Americans

Post  sc4ram Wed Jun 02, 2010 11:51 am

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty Government grant to aid NASA space shuttle contractors slated to lose jobs

Post  sc4ram Fri Jun 04, 2010 11:44 am

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty BCC preps for flood of shuttle workers seeking retraining

Post  sc4ram Wed Jun 09, 2010 11:02 am

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty Shuttle's Time has Come

Post  sc4ram Thu Jun 10, 2010 11:23 am

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty Utah Congressman Calls NASA Moon Program Move "Sleazy"

Post  sc4ram Fri Jun 11, 2010 10:44 am

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty Obama plan called setting for tragedy

Post  sc4ram Sat Jun 12, 2010 11:46 am

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty Orion Budget is Cut 20 Per Cent with 600 Jobs Eliminated and Progress Slowed

Post  sc4ram Tue Jun 15, 2010 4:18 pm

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty Constellation funding up to NASA backers to win over Congress

Post  sc4ram Wed Jun 16, 2010 11:55 am

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty Space shuttle is not in future plans

Post  sc4ram Mon Jun 21, 2010 11:32 am

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty The US remained the world’s biggest manufacturing nation by output last year

Post  sc4ram Tue Jun 22, 2010 11:49 am

This has little to do with the Cape or NASA, but despite the constant hang-wringing we always hear (and is in the article) about manufacturing moving to China, the stats say today that the US is the worlds largest manufacturer. (a fact that I believe most people dont know)


http://sweetness-light.com/archive/china-to-surpass-us-in-manufacturing
sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty Boost NASA funding, space advocates demand

Post  sc4ram Wed Jun 23, 2010 11:45 am

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty John Glenn pushes to keep space shuttle flying

Post  sc4ram Thu Jun 24, 2010 12:42 pm

sc4ram
sc4ram

Posts : 1544
Join date : 2009-07-12
Location : Flroida

Back to top Go down

Up to 9000 Jobs to be lost at the Cape  after the Shuttle goes Obsolete - Page 3 Empty Re: Up to 9000 Jobs to be lost at the Cape after the Shuttle goes Obsolete

Post  Sponsored content


Sponsored content


Back to top Go down

Page 3 of 6 Previous  1, 2, 3, 4, 5, 6  Next

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum